Saturday, December 13, 2008

Windows - day #2, #3, and #4

Oh no! One of the installers left the wet bottom of a garbage can on the bedroom floor. Now there's a water spot in the hardwood. I wonder how Gilkey will fix this.


The living room before. Notice the awful assymetry (mix of picture window, transom, and casement).



The living room windows turned out best of all. The old assymetry is now corrected.



The kitchen before.


This window was tough because the soffit outside was so low. Plus, you had to sit in the sink to get at it.


The kitchen turned out quite well. They did a very nice job coping the trim around the tile.


The dining room before. (Will the carpet look this good when the guys are done?)


The dining room after.



The pink goo is insulating foam. They had to keep the cans in the bathroom by the radiator else they froze up.



The exterior capping looks fantastic.